Welcome to Sub-Floor Solutions  

Home
about_us
Products
Products
Client List
F.A.Q.
Contact Us




  • Vanderbilt Children Hospital - Nashville, TN
    Project - 5 th Floor Renovations
    Scope - 30,000 square feet of Self-Leveling Underlayment
    Product Installed Over Underlayment – Armstrong Medintech Sheet Vinyl

  • Bed, Bath & Beyond
    Various Locations – We have installed new wear toppings and underlayment in over a dozen Bed, Bath & Beyond stores throughout the Southeast United States over the past 5-years
  • Presbyterian Women’s Center – Charlotte, NC
    40,000 square feet of self-leveling SF-100 underlayment was applied to this 1939 building in order to restore the deteriorating concrete, terrazzo and ceramic surfaces to a suitable state for the installation of new sheet vinyl floor covering.
  • The Carlington – Jacksonville, FL
    150,000 square feet of SF-100 distributed over 15 floors at 1 ½” average depth…this job presented new challenges for the Sub-Floor installation team. We were able to pump this entire building from one central location in the basement of the facility using innovative techniques to transport the mixed material straight up 220 feet to the top floor. This project was completed in 30 days and to date is still one of the most notable projects our company has ever taken on.
  • DuPont Pharmaceutical – Puerto Rico
    Sub-Floor Solutions was chosen by this owner to perform the removal and remediation of a serious moisture emission issue that was causing complete failure of their vinyl flooring in their clean room manufacturing facility. Sub-Floor preformed the removal, repair and installation of the finished floor product and left the customer completely satisfied. Five years later and the floor is still performing as it was the day we completed the project.